Arizona · NRMCA 2026 · Updated June 2026
Concrete Prices in Arizona — 2026 Cost Guide + Calculator
Ready-mix concrete in Arizona costs $118–$155 per cubic yard in 2026. Phoenix is the largest and most competitive market; Tucson runs 10–15% cheaper; Flagstaff requires freeze-thaw specs unlike the rest of the state; remote desert areas pay the highest premiums. Summer heat above 110°F cuts the 90-minute drum window nearly in half.
Quick Answer
How Much Does Concrete Cost in Arizona?
Ready-mix concrete in Arizona averages $126 per cubic yard in 2026 for material delivery — virtually identical to the national average of $128/yd³. The $130–$200/yd³ range cited by some sources includes specialty mixes, accelerators for hot-weather pours, and installed costs. Phoenix metro is the most competitively priced metro in the state; Flagstaff and remote desert areas are the most expensive.
Free Tool — Arizona Pricing
Arizona Concrete Cost Calculator
Pre-loaded with Arizona 2026 regional pricing. Select your city for the most accurate local estimate.
Material: NRMCA 2026 Arizona data. Summer surcharge ($8–$15/yd³) for set retarders June–September. Installed: RS Means Arizona labor rates. Get 3 quotes from Cemex, Vulcan, and local independents.
Local Data
Concrete Prices in Arizona — City by City
Arizona prices spread 31% from Tucson ($118) to remote desert areas ($155+), driven by distance to batch plants, summer heat surcharges, and local market competition.
| City / Area | Low | Average | High | Key factors |
|---|---|---|---|---|
| Tucson | $112 | $118 | $135 | Cheaper labor market; multiple plants; lower demand than Phoenix |
| Sierra Vista / Nogales | $115 | $120 | $138 | Border market; some aggregate from Mexico offsets cost |
| Phoenix metro core Phoenix, Tempe, Mesa, Chandler, Gilbert | $118 | $124 | $145 | Most competitive AZ market; Cemex + Vulcan + independents compete; high volume |
| Scottsdale / East Valley | $122 | $128 | $150 | Premium market; higher-end residential; slightly higher labor |
| NW Phoenix / Peoria / Surprise | $124 | $130 | $148 | Fastest-growing AZ submarket; high demand pushes prices up |
| Prescott / Central Highlands | $130 | $138 | $160 | Mountain access; fewer suppliers; cooler climate means less summer surcharge |
| Flagstaff | $135 | $142 | $168 | Only major AZ city with freeze-thaw — requires air-entrained concrete; mountain logistics |
| Remote desert (Yuma, Kingman, Page) | $142 | $155 | $185 | Long haul from Phoenix plants; extreme heat additives; minimal competition |
Source: NRMCA 2026 · RS Means Arizona metro cost data. Summer surcharges (Jun–Sep) not included — add $8–$15/yd³ for Phoenix metro pours during peak heat.
Project Reference
Arizona Concrete Cost by Project — 2026
Using Arizona statewide average of $126/yd³. Summer pours add $8–$15/yd³. Installed costs use RS Means Arizona labor rates.
| Project | Dimensions | Thickness | Yd³ | Material (AZ avg) | Installed (AZ) |
|---|---|---|---|---|---|
| Small patio / 10×15 | 10×15 ft | 4" | 2.1 | $236–$282 | $750–$1,650 |
| 25×25 slab | 25×25 ft | 4" | 8.6 | $969–$1,159 | $3,125–$6,875 |
| 20×20 slab | 20×20 ft | 4" | 5.5 | $621–$742 | $2,000–$4,400 |
| Single driveway | 40×12 ft | 6" | 9.8 | $1,107–$1,323 | $3,840–$7,680 |
| 30×30 slab | 30×30 ft | 4" | 12.4 | $1,399–$1,673 | $4,500–$9,900 |
| 30×40 slab @ 4" | 30×40 ft | 4" | 16.5 | $1,863–$2,228 | $6,000–$13,200 |
| 40×60 barn / shop | 40×60 ft | 6" | 49.3 | $5,567–$6,657 | $14,400–$28,800 |
| Pool deck | 500 sq ft | 4" | 6.9 | $779–$931 | $2,500–$5,500 |
Summer pours (Jun–Sep) add $80–$150 per truck load in retarder costs. Schedule large pours for October–May for best pricing and curing conditions.
Arizona-Specific Factor
Summer Heat and Concrete in Arizona — What Every Homeowner Must Know
Phoenix regularly reaches 110–118°F from June through September. At these temperatures, concrete hydration accelerates dramatically — what normally takes 90 minutes to begin stiffening can happen in 30–45 minutes. This is the single most important factor for Arizona concrete projects and the reason summer pours cost more.
Arizona contractors and suppliers manage this with three strategies:
- Set retarders — chemical admixtures that slow hydration ($5–$10/yd³)
- Chilled water or ice in the batch mix ($3–$8/yd³)
- Early morning pours — most Phoenix contractors start at 4–5am in summer
For Contractors
How Much to Charge Per Square Foot of Concrete in Arizona
This is one of the most-searched concrete questions in Arizona — and almost nobody answers it directly.
For Arizona concrete contractors, typical installed charge rates in 2026:
| Project Type | Charge range (installed) |
|---|---|
| Basic patio / walkway | $6–$9/sq ft |
| Standard driveway (6") | $8–$12/sq ft |
| Broom finish, flatwork | $7–$10/sq ft |
| Stamped concrete | $14–$22/sq ft |
| Exposed aggregate | $10–$16/sq ft |
| Pool deck (broom) | $8–$12/sq ft |
| Summer premium (Jun–Sep) | +$1–$2/sq ft |
These rates reflect Phoenix metro 2026 market rates. Tucson runs $0.50–$1.50/sq ft less. Scottsdale and North Scottsdale premium residential can support $1–$2/sq ft more for the same work.
Common Questions
Concrete Prices in Arizona — FAQ
Ready-mix concrete in Arizona costs $118–$155 per cubic yard in 2026, with a statewide average of $126/yd³. Tucson averages $118/yd³; Phoenix metro averages $124–$130/yd³; remote desert areas run $155+. Summer pours (June–September) add $8–$15/yd³ for heat retarders required by ACI 305.
A 40×60 ft slab at 6 inches thick in Arizona requires about 49 cubic yards. Material cost runs $5,567–$6,657. Installed cost including labor, rebar, subbase, and forming typically runs $14,400–$28,800. Summer pours add $400–$750 for heat retarders on a project this size. Schedule for October–May for best pricing.
A 20×20 ft slab at 4 inches thick in Arizona requires about 5.5 cubic yards. Material cost runs $621–$742. Installed cost runs $2,000–$4,400 depending on location — Tucson at the low end, Scottsdale at the high end. Summer pours add $70–$110 in heat admixtures for this project size.
Arizona concrete contractors typically charge $6–$12 per square foot installed for standard flatwork in 2026. Basic patios and walkways run $6–$9/sq ft. Driveways at 6 inches run $8–$12/sq ft. Stamped concrete runs $14–$22/sq ft. Summer pours (June–September) typically add $1–$2/sq ft to cover heat admixture costs. Scottsdale premium residential supports the high end of each range.
ASTM C94 allows 90 minutes from water contact to discharge, but in Phoenix summer heat above 110°F, concrete can begin stiffening in 30–45 minutes. Arizona contractors and suppliers manage this with set retarders, chilled water batching, and early-morning scheduling (4–5am starts in July and August). If your plant is more than 20 minutes from your site in summer, ask explicitly about their hot-weather protocol.
Arizona city-level pricing from NRMCA 2026 and RS Means cost multipliers for Phoenix, Tucson, Flagstaff, and Prescott markets. Summer heat surcharge estimates from ACI 305R hot-weather protocols and contractor-reported Phoenix market data. Flagstaff freeze-thaw data from NOAA climate normals. Contractor rate ranges from Arizona contractor forums and industry surveys (2025–2026). Updated June 2026.